
Credit: Beridi Maritime.
We are excited to be part of Beridi’s Maritime team to bring this innovative hybrid concept to reality.
FWTC has been supporting Beridi with control design, fully-coupled loads analyses, ultimate and fatigue limit state design of tower and tower-floater interface, and structural design of the tower-Archime3 connection and floater.
Cannot wait to see the demo in open waters! Go Beridi!